The deposit has been commercially mined since 1971. Initially, metallurgical grade fluorspar was produced. In 1975 a 100,000 ton per annum acid grade fluorspar concentrator was commissioned and by 1979 metallurgical grade fluorspar was no longer produced as primary product, but can still be produced as secondary product for smaller consignments.

The Kimwarer ore deposit has now been mined for over 35 years. Mining is by open cast methods. Overburden is removed at a ratio of 3:1 to 8:1 (waste to ore) depending on the ore body, with over 700,000 tons of waste being stripped per annum at current production levels. Overburden is normally trucked away using 25 ton trucks provided by contractors, while the exposed ore is extracted by drilling and blasting. A total of approximately 360,000 tons of ore is mined annually. The geology has indicated that the ore body extends beneath the valley floor level and an open pit is being planned.

 

News Flash

Watch Charles Field-Marsham, Chairman Kenya Fluorspar interview with CNBC Africa. Click here for More detail


Mine Office Address:
P.O Private bag
Kimwarer, Kerio Valley Eldoret
Tel:  +254 53 22460/1
Fax:  +254 53 22414
Email:  info@kenyafluorspar.co.ke
Sales Office Address: 
3rd  Floor,Ya-Ya Centre
Argwing Kodhek Avenue,Nairobi.
Tel:  +254 20 3872794,
        +254 20 3870557
Fax:  +254 20 3872796