| Mining Operations |
|
|
|
| Written by Administrator | |||
|
The deposit has been commercially mined since 1971. Initially, metallurgical grade fluorspar was produced. In 1975 a 100,000 ton per annum acid grade fluorspar concentrator was commissioned and by 1979 metallurgical grade fluorspar was no longer produced as primary product, but can still be produced as secondary product for smaller consignments.
|
|||